Issyk HPP-02

Issyk HPP-02 is a diversified HPP utilizing the section of the Issyk river for hydropower purposes. HPP is designed to transfer electricity to the power grid of south of Kazakhstan.

Gross installed capacity 4.95 MW

Gross electric power output, yearly23 million kWh

Location Republic of Kazakhstan, Almaty Region, Issyk Gorge of Zailiysky Alatau

Development of design estimates is ongoing.

Readmore

Verkhne-Baskansk HPP-2

Verkhne-Baskansk HPP is a diversion HPP utilizing upper portion of the Baskan River for hydraulic power generation. HPP is designed to transfer electricity to power grid of the south of Kazakhstan.

Gross installed capacity 10.6 MW

Gross electric power output, yearly 54 mln. kW*h

Location Sarkand district of Almaty region of the Republic of Kazakhstan, 180 km from Taldykorgan, near Yekiasha village.

 

A contract with “Accounting and Finance Centre for the Support of Renewable Energy Sources”, LLP, has been concluded for purchase of electricity.

The project has a positive conclusion of state expertise.

Readmore

Verkhne-Baskansk HPP-3

Verkhne-Baskansk HPP is a diversion HPP utilizing upper portion of the Baskan River for hydraulic power generation. HPP is designed to transfer electricity to power grid of the south of Kazakhstan.

Gross installed capacity 4.3 MW

Gross electric power output, yearly 22.5 mln. kW*h

Location Sarkand district of Almaty region of the Republic of Kazakhstan, 180 km from Taldykorgan, near Yekiasha village.

 

A contract with “Accounting and Finance Centre for the Support of Renewable Energy Sources”, LLP, has been concluded for purchase of electricity.

The project has a positive conclusion of state expertise.

Readmore

Rudnichnaya HPP-1 and HPP-2

Rudnichnaya HPPs, diversion type, is a cascade of two HPPs  utilizing middle portion of the Koksu River for hydraulic power generation. HPPs are designed to transfer electricity to power grid of the south of Kazakhstan.

Gross installed capacity: 42 MW

Gross electric power output, yearly: 185.1 mln. kW*h

 

Location: Kerbulak district of Almaty region of the Republic of Kazakhstan, 80 km away from Taldykorgan, near Rudnichnaya village.

 

 

The project is included to the List of the Ministry of Energy of the RK for energy producing organizations using renewable energy sources, holding site construction project feasibility study for the use of renewable energy sources, approved and agreed with authorized body or local executive body.

 

A contract with “Accounting and Finance Centre for the Support of Renewable Energy Sources”, LLP, has been concluded for purchase of electricity.

 

The project has a positive conclusion of state expertise.

Readmore

Nizhne-Baskansk HPP-1 and HPP-2

Nizhne-Baskansk HPP-1 is a diversion HPP utilizing lower portion of the Baskan River for hydraulic power generation. HPP is designed to transfer electricity to power grid of the south of Kazakhstan.

Gross installed capacity 5 MW

Gross electric power output, yearly 27 mln. kW*h

Location   Sarkand district of the Almaty region of the Republic of Kazakhstan, 170 km from Taldykorgan, near Almaly village.

 

The project is included to the List of the Ministry of Energy of the RK for energy producing organizations using renewable energy sources, holding site construction project feasibility study for the use of renewable energy sources, approved and agreed with authorized body or local executive body.

 

A contract for purchase of electricity has been concluded with “Accounting and Finance Centre for the Support of Renewable Energy Sources”, LLP.

 

The project has a positive conclusion of state expertise.

 

Nizhne-Baskansk HPP-2 is a diversion HPP utilizing lower portion of the Baskan River for hydraulic power generation. HPP is designed to transfer electricity to power grid of the south of Kazakhstan.

Gross installed capacity 5 MW

Gross electric power output, yearly 27 mln. kW*h

Location   Sarkand district of the Almaty region of the Republic of Kazakhstan, 170 km from Taldykorgan, near Almaly village.

 

The project is included to the List of the Ministry of Energy of the RK for energy producing organizations using renewable energy sources, holding site construction project feasibility study for the use of renewable energy sources, approved and agreed with authorized body or local executive body.

 

A contract for purchase of electricity has been concluded with “Accounting and Finance Centre for the Support of Renewable Energy Sources”, LLP.

The project has a positive conclusion of state expertise.

Readmore

Pokatilov reservoir

The reservoir is planned to be built to regulate the flow of the Baskan River and be used for irrigation, hydropower generation, fishery and recreation.

Dam specifications:

Reservoir capacity

Total – 80.0 mln. cu m

Useful – 77.0   mln. cu m

Dead volume-3.0 mln. cu m

 

Location – along the Baskan River, below Yekiasha village of Sarkand district of Almaty region.

 

As of today, following works on feasibility study development have been completed in full:

– research works;

– engineering geodesic and engineering-geological works;

– hydrology and water management calculations;

– hydraulic structures;

– Hydromechanical equipment;

– Electric power equipment;

– Land management;

– Fishery measures;

– Pre-EIA

 

Readmore