Issyk HPP is a diversion HPP utilizing a portion of the Issyk River for hydraulic power generation. HPP is designed to transfer electricity to power grid of the south of Kazakhstan.

 

Gross installed capacity 4.9 MW

Gross electric power output, yearly 24.5 mln. kW*h

Location – The Republic of Kazakhstan, Almaty region, Issyk gorge of Zailiysky Alatau

 

A contract for purchase of electricity has been concluded with “Accounting and Finance Centre for the Support of Renewable Energy Sources”, LLP.

 

Issyk HPP-2 is a diversion HPP utilizing a portion of the Issyk River for hydraulic power generation. HPP is designed to transfer electricity to power grid of the south of Kazakhstan.

   Gross installed capacity 4.9 MW

Gross electric power output, yearly 23 mln. kW*h

Location The Republic of Kazakhstan, Almaty region, Issyk gorge of Zailiysky Alatau

 

A contract for purchase of electricity has been concluded with “Accounting and Finance Centre for the Support of Renewable Energy Sources”, LLP.