Nizhne-Baskansk HPP-1 and HPP-2
Nizhne-Baskansk HPP-1 is a diversion HPP utilizing lower portion of the Baskan River for hydraulic power generation. HPP is designed to transfer electricity to power grid of the south of Kazakhstan.
Gross installed capacity 5 MW
Gross electric power output, yearly 27 mln. kW*h
Location Sarkand district of the Almaty region of the Republic of Kazakhstan, 170 km from Taldykorgan, near Almaly village.
The project is included to the List of the Ministry of Energy of the RK for energy producing organizations using renewable energy sources, holding site construction project feasibility study for the use of renewable energy sources, approved and agreed with authorized body or local executive body.
A contract for purchase of electricity has been concluded with “Accounting and Finance Centre for the Support of Renewable Energy Sources”, LLP.
The project has a positive conclusion of state expertise.
Nizhne-Baskansk HPP-2 is a diversion HPP utilizing lower portion of the Baskan River for hydraulic power generation. HPP is designed to transfer electricity to power grid of the south of Kazakhstan.
Gross installed capacity 5 MW
Gross electric power output, yearly 27 mln. kW*h
Location Sarkand district of the Almaty region of the Republic of Kazakhstan, 170 km from Taldykorgan, near Almaly village.
The project is included to the List of the Ministry of Energy of the RK for energy producing organizations using renewable energy sources, holding site construction project feasibility study for the use of renewable energy sources, approved and agreed with authorized body or local executive body.
A contract for purchase of electricity has been concluded with “Accounting and Finance Centre for the Support of Renewable Energy Sources”, LLP.
The project has a positive conclusion of state expertise.